Metal Art DXB logoMETAL ART DXB
Get a quote
Steel frame fabrication in our workshop
Steel structures installed on site
Steel frame structure built in our workshop
Exhibition stand built by Metal Art DXB

Home/Services/Exhibition mezzanine floors

Exhibition mezzanine floors

Double-deck stands and raised platforms for exhibitions: steel structure, stairs, balustrades and decking, fabricated and installed by our team.

  • Steel structure
  • Stairs & balustrades
  • Decked floor
  • Bolted for build-up
Now showing01 / 04
Steel frame fabrication in our workshop

More space on the same footprint

A mezzanine turns one stand into two floors: meeting rooms or a lounge upstairs, the open display below. It is one of the most effective ways to get more from an expensive exhibition space, and one of the parts of a stand where fabrication quality matters most.

We fabricate the steel frame, columns, beams, stairs and balustrades for exhibition mezzanines in our Ras Al Khor workshop, together with the decking and the finishes that tie it into the stand design. Sections are designed to bolt together quickly during build-up and to come apart cleanly at dismantle.

Planned with the organiser's rules in mind

Exhibition halls have their own requirements for double-deck structures, and organisers usually ask for drawings and details before approval. We prepare fabrication drawings for your design and coordinate with your stand designer on what the organiser needs from the build side.

What we supply for mezzanines

The structure and the parts visitors see and touch.

Steel structure

Columns, beams and bracing sized to the design.

Stairs

Straight or turning stairs with treads and handrails.

Balustrades

Glass, mesh, panel or rail balustrades to suit the stand.

Decking

Upper floor decking with a finish that matches the stand.

Cladding

Fascia and column cladding so the structure disappears into the design.

Build-up & dismantle

Installation and removal by our crew.

Related work

Steel structures and exhibition work from our workshop.

Why Metal Art DXB

Structure, stairs, balustrades and finishes come from one workshop, so the mezzanine fits the stand without gaps between suppliers.

In-house workshopMetal and wood fabrication under one roof in Ras Al Khor Industrial Area 2.
Open 24 hoursOur workshop runs around the clock for tight event and seasonal deadlines.
One teamDrawings, fabrication, finishing, delivery and installation handled by one company.
UAE, Oman & GCCBased in Dubai, installing across all seven Emirates, Oman and the wider GCC.

In our workshop: CNC router · laser cutting · tube and pipe bending · press brake · TIG and MIG welding · spray painting booth · carpentry and joinery. Materials: mild steel, stainless steel, aluminium, acrylic, ACP, wood, MDF and plywood.

Questions clients ask

What is an exhibition mezzanine floor?

It is a raised upper floor built within an exhibition stand, usually on a steel frame, creating a second level for meetings or hospitality above the display area.

Do organisers need to approve a mezzanine?

Most halls require approval for double-deck stands. We prepare the fabrication drawings and details your stand designer needs to submit.

Can a mezzanine be reused?

Yes. We build in bolted sections so the structure can be stored and rebuilt for future shows.

How do I get a price for a mezzanine?

Send the stand design, upper floor size, finishes and show dates for an itemised quotation.

Get a quotation

Send your drawings, a render or a short description with your date and location. We reply with questions or an itemised quotation.

Phone+971 50 350 8934 WhatsApp+971 50 350 8934 Emailmetalarttechnical@gmail.com
Workshop · open 24 hoursRas Al Khor Industrial Area 2, Dubai

You can also send drawings directly on WhatsApp.